Sign Installation Roadmap for Newbridge
Milestones |
Description |
Timeline |
Site Survey |
1. Structure of the Awning Assess the structure to ensure it can support the signs. |
ETA: 7 Days
Started: March 25 Completed: March 25
Status: Done |
Installation Strategy |
2. Installation Plan Plan the placement and secure installation methods for both the channel letter signs and the LED sign. |
ETA: 7 Days
Started: March 29 Completed: Apr 6
Status: Done |
3. Size and Specification Confirm the height and width of the signs atop the awning. |
ETA: 7 Days
Started: Apr 5 Completed: May 2
Status: Done |
|
Curved Signage |
Engineering Plans Conceptualize how the LED sign will fit across the curved surface. |
ETA: 15 Days
Completed: May 12 Status: Done |
Channel Letters |
4. Design Channel Letters Initial designs for 8-inch tall channel letter signs. |
ETA: 20 Days
Started: May 2 Completed: May 22
Status: Done |
5. Channel Letters Revision Create revision sets for 10-inch tall channel letter signs as per customer request. |
ETA: 2 Days
Started: May 23 Completed: May 27
Status: Done |
|
5. Color Revision Create revision sets to match the brand colors. |
ETA: 2 Days
Completed: June 11
Status: Done |
|
Stamped Drawings |
6. Stamp the Engineering Drawings Update the drawings and strategies to meet engineering requirements and obtain necessary stamps. |
ETA: 15 Days
Started: June 6 Completed: June 18
Status: Done |
Permit |
7. Pre-Permit Paperwork Compile all required documents and details for the permit application. |
ETA: 3 Days
Started: June 11 Completed: June 14
Status: Done |
8. Permit Submission Submit the permit application to the appropriate authorities for approval. |
ETA: 1 Day
Started: June 18 Completed: June 18
Status: Done |
|
9. Approval and Review Revise drawings to meet local zoning ordinances. |
ETA: 30 Days
Status: Pending |
|
Production & Manufacturing |
10. Manufacturing: Start, sign assembly, frame fabrication, and channel letter customization. |
ETA: 42 Days
Status: Open |
Delivery |
10. Shipping Deliver the signs to the nearest assembly location. |
ETA: 7 Days
Status: Open |
Software Training |
11. Software Session Basics on programming the sign and ads. |
ETA: 1 Hour
Status: Open |
On Site Installation |
12. Prepare Connect the Signs to the Circuit. |
ETA: 3 Days
Status: Open |
13. Install Securely mount the signs on the designated areas. |
ETA: 3 Days
Status: Open |
|
14. Test Test the sign's color, electricity, network and connection. |
ETA: 3 Days
Status: Open |