FAQ: How to Apply for Electronic Message Sign (LED) Permits in Fort Myers
If you're planning to install an electronic message sign (LED) in Fort Myers, Florida, here’s a comprehensive guide to help you through the permit application process, whether you choose to apply online or offline.
1. Where Do I Start the Application Process?
You can start the application process for an LED electronic message sign permit either online or offline.
- Online: Use the EnerGov Customer Self Service Portal.
- Offline: Download the sign permit application from the City of Fort Myers website.
2. What Resources Are Available to Help Me?
The City of Fort Myers provides instructional videos on the EnerGov Customer Self Service
3. How Do I Submit My Permit Application Online?
Follow these steps to submit your permit application electronically:
- Step 1: Register on the EnerGov Customer Self Service Portal.
- Step 2: Complete the sign permit application form.
- Step 3: Upload the completed application form and the building plans to the portal.
4. How Do I Submit My Permit Application Offline?
To apply offline:
-
Step 1: Download the sign permit application form
-
Step 2: Complete the application and attach the required building plans.
-
Step 3: Submit the completed application and plans at the City Hall to the following address:
City of Fort Myers
2200 Second Street
Fort Myers, FL 33901
5. What Happens After I Submit My Application?
Once your application is submitted:
- Review: City staff will review your application and plans.
- Corrections: If corrections are needed, you’ll be notified via email (for online submissions) or by mail (for offline submissions). You must then make the corrections and resubmit the revised documents.
- Approval: If no corrections are needed, you'll be notified of any fees due, which can be paid online through the EnerGov portal or as directed by the City for offline submissions.
6. What Are the Job Site Requirements?
After your permit is issued, ensure that the Inspection Record Board and Approved Drawings are on-site during construction. These are required for inspections.
8. What Information Should Be Included in My Application?
Your permit application should include:
- Type of Sign: Specify that it’s an electronic message sign (LED).
- Type of Installation: To replace old sign with a new one, check repair
- Dimensions: Include the total area and size of the sign.
- Description of Work: Provide detailed information about the project.
- Contractor Information: Include the contractor’s name, license number, company name, and contact details.
9. Can I Apply as an Owner-Builder?
Yes, property owners can apply as owner-builders. Be sure to select this option in the application process, whether applying online or offline.
For more information, refer to the instructional videos on the EnerGov Customer Self Service Portal or contact the City of Fort Myers Permitting Office directly.