Dedicated Power Line for LED Sign
30 AMPS Power Line
Secure Permit
Secure Permit
Bid Due:
May 22, 2024
May 22, 2024
Rewire & Troubleshoot
Description
We are initiating a project in Austin Texas 78721. This effort involves:
- Permit Acquisition: Securing necessary electric permits.
-
Electrical Work:
- 1. Disconnect the current timer setup to ensure the sign has a consistent power supply.
- 2. Install a new 30-amp dedicated power line for the LED sign.
- 3. Ensure the new power line meets all local electrical codes and standards.
- 4. Install any necessary conduit, junction boxes, and other hardware to protect and support the new power line.